
Water gutter roll forming machine | Gutter roll forming machine | downpipe roll forming machine
Warranty: 3 Year
Working days: 40 working days
Payment Terms: TT, LC
Container: 20 Feet
Export port: Tianjin Port
Place of Origin: Tianjin , China
Product Detail



Work Flow

Diameter Of Roll Forming Machine
Machine Specification
|

Machine Specification
Receiving Table
| Table Length | 2-3m |
| Operataion | Manual Stacker |
Receiving table use to collect finished product
When finish work, you can use forklift take it away

Machine Specification
1). Packing method: Nude, seller should guarantee equipment will be moisture-proof, anti corrosive, and will not be damaged during transportation.
2). Payment Term: 30% of total contract value paid by T/T, last 70% paid by T/T after inspection by buyer in seller’s factory while before delivery.
3). Delivery Time: The seller guarantees the equipment will be ready for shipment within 40 working days after receipt of deposit from the buyer.
4). Service: We could send technician to your country to fix the machine if you need. The buyer need to pay for all the cost, including: visa, round trip tickets, accommodation, salary of USD 120 per day.
5). Warranty: 36 months During warranty, the replaceable parts are free, but the buyers need to pay for the shipping fee.
We Sell to Country




